New ERP Energy Saving Light Plastic 220

Products

HomeHome / Products / 220~240V G9 / Details
New ERP Energy Saving Light Plastic 220

New ERP Energy Saving Light Plastic 220

Product Picture ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ Product Features ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ ERP FINISHED 1. Aluminum + PBT materi

Send your inquiry

DESCRIPTION

Basic Info.
Model NO. G9-P-011
Usage Residential
Warranty 2 Years
IP Rating IP20
Input Voltage 170-260V
Beam Angle 270
Lifetime 15000h
PF 0.5
Lumen 800
CRI(Ra) >80
Size 60*106
Driver IC Driver
CCT 2700K-6500K
Transport Package 1PCS/Box
Specification A60
Trademark ALVA / OEM
Origin China
HS Code 85395000
Production Capacity 1000000/Month
Product Description
Product Picture
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯

Product Features
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯ERP FINISHED
1. Aluminum + PBT materials , good heat dissipating and safe
2. Uniform light distribution
3. 2years warranty, reliable quality
4. RGB+W, high lumen output
5. 85-265V, 170-240V, 220-240V driver can choose
6. Low energy use and waste , environment friendly
7. CRI>80Product Parameter
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
MODEG9-P-005G9-P-006G9-P-009G9-P-010G9-P-021G9-P-011G9-P-012G9-P-013
Wattage3W4W4W5W5W5W3.5W4W
Lumen3000K=330LM 6500K=350LM 3000K=380LM 6500K=400LM3000K=450LM 6500K=470LM550lm600lm638lm390lm450lm
Size16.5*50mm19*56mm19*59mm
CRICRI>80
VoltageAC170-260V
CCT2700-6500K
BaseG9
Beam Angle270
Working Temp-20 to 45ºC

Appliancations
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯For use in Ceiling Lights, Pendant Lights, Desk Lamps, Table Lights, Puck Lights, Under-counter Lights, Closet Lights, Under-cabinet Lights.

New ERP Energy Saving Light Plastic 220-240V G9 5W 638lm, 550lm, 480lm, 400lm LED Bulb Lamp

New ERP Energy Saving Light Plastic 220-240V G9 5W 638lm, 550lm, 480lm, 400lm LED Bulb Lamp

New ERP Energy Saving Light Plastic 220-240V G9 5W 638lm, 550lm, 480lm, 400lm LED Bulb Lamp


New ERP Energy Saving Light Plastic 220-240V G9 5W 638lm, 550lm, 480lm, 400lm LED Bulb Lamp

New ERP Energy Saving Light Plastic 220-240V G9 5W 638lm, 550lm, 480lm, 400lm LED Bulb Lamp


New ERP Energy Saving Light Plastic 220-240V G9 5W 638lm, 550lm, 480lm, 400lm LED Bulb Lamp


FAQ
Payment:
1. Samples: Bank TT, 100% payment in advance;
2. Bulk order: Bank TT, 30% deposit and balance 70% settled before shipment.
Delivery time:
1. Samples: 3-7 working days;
2. Bulk order: 30-40 working days
Warranty:
1,2,3,5 years warranty as you request
Shipping Method:
1. By Express: DHL, UPS, Fedex, a fast and safe way for shipping, normally 3-5 working days for delivery;
2. By Air: In some area, the shipping cost by air is more favorable than by Express; 5-7 days for delivery;
3. By Sea: the most economic shipping method, but cost longer shipping time; large quantity, heavy and not urgent goods can choose
this way.
4. Your shipping agent or forwarder.
After-Sale Service:
1. Quick reply on customers'questions;
2. If anything goes wrong with the products'quality, we will replace for you free
3. Make you a happy ordering.
Quality Control:
100% of the lamps will be tested its quality reliability , and we will also test its;
temperature after 24 hours' lighting.Then after it is cool we again test 100% of the lamps to see if it still work well;
Each lamp should pass all these QC procedures before shipping to customer.
Delivery Detail:
We ship goods by UPS/DHL/FEDEX/TNT express which takes 3~ 5 days to arrive, or by air cargo which takes about one week to arrive .
or by sea which takes about one month to arrive , depending on your actual requirements.
Our services:
1. For all your inquires about us or our products, we will reply you in detail within 24 hours;
2. We own well-tranied and passional sales & after- sale services who can speak fluent Engligh language;
3. We offer OEM services. Can print your own logo on product , can customize the retail box packing and other things.
4. We have very experienced R&D engineers and we have strong ability to do OEM